OK -- Continue to next step.
2. CHECK HARNESS AND CONNECTOR (TRANSMISSION WIRE - ECM)
(a) Connect the transmission wire connector to the transaxle.
(b) Disconnect the ECM connectors.
(c) Measure the resistance according to the value(s) in the table below.
Standard resistance:
NG -- REPAIR OR REPLACE HARNESS OR CONNECTOR
OK -- REPLACE ECM (for 2ZR-FE) See: Powertrain Management/Computers and Control Systems/Engine Control
Module/Service and Repair/Removal
3. INSPECT SHIFT SOLENOID VALVE S1
(a) Remove the shift solenoid valve S1.
(b) Measure the resistance according to the value(s) in the table below.
Standard resistance:
(c) Connect the positive (+) lead to the terminal of the solenoid connector, and the negative (-) lead to the solenoid body.
No comments:
Post a Comment